Where we started
Tired changing rooms with failing floors, poor drainage and dated fittings needed to be brought up to a hygienic, modern standard within a tight shutdown window.
A complete refurbishment of changing rooms and shower areas with seamless resin flooring, tiled walls and new cubicles.
Tired changing rooms with failing floors, poor drainage and dated fittings needed to be brought up to a hygienic, modern standard within a tight shutdown window.
We stripped the areas back to the substrate, formed new falls to linear drains, tanked the wet zones and laid seamless slip-resistant resin floors with coved skirtings. Walls were tiled in large-format porcelain and new cubicles, showers and pipework were installed throughout.
Clean, bright and easy-to-maintain changing and shower areas that are waterproof from the ground up and built to withstand heavy daily use.
10 shots from the strip-out and first fix. The unglamorous stages are where a finish is won or lost, so we show them.